摘要
针对华能陕西秦岭发电有限公司的国产亚临界200 MW机组的汽轮机监视仪表(TSI)及瞬态管理系统(TDM)由于安装环境引起的软、硬件故障及死机问题,进行了改变系统的拓扑结构、升级相应的系统软件及远距离显示和运行操作的改造。改造后,TSI和TDM的可靠性得到了提高,未再出现死机等故障。
Directing against problems of software and hardware fault as well as dead computers resulted from bad installalation environment of turbine's supervisory instruments (TSI) and transient data management (TDM) system for sub- supercritical 200 MW units manufactured at home and equiped in Qinling Power Generation Co Ltd, a retrofit for improving the topogical structure of said system, up- grading the corresponding softwares of the system,as well as modifying the remote display and the op- erating manipulation.has been carried out. After retrofitting,the reliability of TSI and TDM has been enhanced,the faults of dead computers etc. haven't occurred again.
出处
《热力发电》
CAS
北大核心
2009年第8期125-126,128,共3页
Thermal Power Generation
关键词
汽轮机
TSI
TDM
系统配置
结构
死机
steam turbine
TSI
TDM
allocation of system
structure
dead computer