摘要
介绍了平顶山-洛南500 kV线路工程中对斜柱斜面斜地螺基础施工控制的方法,包括跟开尺寸、倾斜角度、地螺偏移等施工控制方法进行了介绍,并对不同的计算方法进行了比较。
The method of engineering control towards the foundation with oblique pillar, inclined plane and oblique ground bolt, in the project of Pingdingshan-Luoyang 500 kV line, was introduced, including tracking apart dimension, inclination, ground bolt deviation, etc. The different computational methods were compared as well.
出处
《湖北电力》
2009年第4期55-56,共2页
Hubei Electric Power
关键词
斜柱斜面斜地螺
基础
控制
oblique pillar
inclined plane and oblique ground bolt
foundation
control