期刊文献+

以钻代坑及坑钻组合探矿方式在矿山的实施 被引量:4

Prospecting Implementation of Drills Replaced by Pit and the Combination of Pit with Drills in the Mine
下载PDF
导出
摘要 介绍了红透山矿床地质概况,生产勘探工程系统及采取的探矿措施。通过对-647中段实施以钻代坑、坑钻组合方式探矿,三级矿量得到平衡。既节约了坑探进尺,又探明和升级了该中段地质储量。 This paper introduced geology, engineering system of productive exploration and prospect measures be used in Hongtoushan Copper Mine. By using prospecting implementation of drills replaced by pit and the combination of pit with drills in the mine, three levels of quantities of mineral deposits obtained the balance. Both saved the gallery prospecting to enter the ruler, and verified and promoted this centersection geological reserve.
出处 《有色矿冶》 2009年第4期23-25,34,共4页 Non-Ferrous Mining and Metallurgy
关键词 以钻代坑 坑钻组合 探矿设计 地质效果 储量增加 drills a generation of pit, the pit drills the combination prospecting design geological effect reserves increase
  • 相关文献

参考文献2

共引文献7

同被引文献7

引证文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部