摘要
介绍了洛清江里定水电站质量监督工作中,针对洛清江里定水电站工程特点,采用项目与专业相结合组建质监项目组。论述了项目组实行"监、帮、促"全过程管理的工作方法和流程。
In view of the features of Liding Hydropower Plant on Luoqingjiang river, the construction quality supervision project group was set up by combining project with speciality. An introduction was made on the working methods and procedures of entire-process management, and on the concept followed by the project group and incorporating supervison, help and promotion.