期刊文献+

斜层平推法在居甫渡电站碾压混凝土坝中的运用 被引量:2

The Use of the Inclined Layer Horizontal Pushing Method of Concrete Placement for Construction of the Roller Compacted Concrete Dam of Jufudu Hydropower Project
下载PDF
导出
摘要 居甫渡水电站为了确保在低强度施工条件下的碾压混凝土施工质量,根据自身特点和借鉴了相关工程的成功经验,采用斜层平推铺筑法碾压混凝土施工新技术,取得了较好的施工效果。 In order to ensure the miler compacted concrete dam construction quality of Jufudu Hydropower Project under the condition of construction with low intensity the inclined layer horizontal pushing method of concrete placement was used for construction of the miler compacted concrete dam of Fufudu Hydropower Project according to both the characteristics of its own and the successful experience obtained from other completed dams of this kind. It is a new technology and has proved successful.
出处 《云南水力发电》 2009年第4期72-75,共4页 Yunnan Water Power
关键词 斜层平推铺筑 施工工艺 碾压参数 质量检测 concrete placement by horizontal pushing in inclined layers construction technology roller compaction parameters quality test
  • 相关文献

参考文献2

  • 1吴佳茹 林志达 李继海.斜层平推法在江垭碾压混凝土坝中的运用.吉林水电,2005,(9).
  • 2SL53-94水工碾压混凝土施工规范[S].北京:中国电力出版社.

同被引文献1

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部