摘要
在分析磨刀门河口潮汐、水流、泥沙特性的基础上,结合2001年枯季口内灯笼山断面流量、输沙率同步实测过程线,对该断面的逐时输沙关系进行回归分析,发现无论涨潮阶段还是落潮阶段,其相关性均很高。同时通过单宽输沙量分解,对磨刀门悬沙输移主要因素进行分析,结果表明磨刀门在枯季期间以悬沙输移优势流贡献为主,悬沙向海输运。
Based on the analysis of the characteristics of tide, flow and sediment at the Modaomen outlet, with the data from the synchronization time series of tidal discharge and sediment transport rate during the dry season in 2001 at Denglongshan section, it is found that" there is a very high correlation both in flood tide or ebb tide stage through the regression analysis. At the same time, through the mechanism decomposition of unit width sediment flux, the main factors of suspended sediment transport in Modaomen outlet are gained. The conclusion is that the main contribution of the suspended sediment transport is residual flow during the dry season, so the suspended sediment is transported to the sea
出处
《海洋工程》
CSCD
北大核心
2009年第3期112-116,共5页
The Ocean Engineering
基金
水文水资源与水利工程科学国家重点实验室开放基金资助项目(2007491211)
广东省交通厅科研专项资助项目(2007-31)
关键词
磨刀门
枯季
输沙关系
回归分析
灯笼山断面
Modaomen outlet
dry season
sediment transport
regression analysis
Denglongshan section