摘要
某市市政主干道建设过程中下穿高速公路处须修建3条车行隧道。隧道与既有高速公路高架桥桥墩相遇,须对既有6个高架桥墩基础进行结构托换。通过对其结构托换所涉及的技术问题,控制因素分析、结构处理,施工要求及监控等进行了系统的分析、介绍,以期为今后结构托换工程提供借鉴。
It is necessary to build 3 tunnels under the expressway during the main road construction process in a city. When the tunnels under construction meet the existing viaduct piers, these 6 existing piers should be underpinned. Through a systematic analysis of the underpinning technology on controlling factors, structural treatment, construction demand and monitoring, it can be a reference for future similar engineerings.
出处
《中国市政工程》
2009年第4期34-35,共2页
China Municipal Engineering
关键词
隧道施工
既有桥梁
桩基托换
施工监测
tunnel construction
existing bridge
pile foundation underpinning
construction monitoring