期刊文献+

工业工程在汽车生产线物料上线运送方式优化中的应用研究 被引量:2

A Study on the Application of Industrial Engineering to the Optimization of Material Moving and Loading for Automotive Productions
下载PDF
导出
摘要 利用现场IE方法对物料运输时的运输路线、动作、时间等因素进行标准化模拟分析,研究拖车与铲车上线作业时间与运输距离的关系,从而得出不同运输距离情况下拖车与铲车的运输效率。通过某汽车厂的生产线物流规划进行数值演算和验证,结果表明运输距离73m是选择拖车或铲车上线方式的分界线。 A standardized simulation analysis is performed on the route, motion and time of material moving by utilizing on-spot industrial engineering technique. The relationships between operation time and material moving distance for both cases of using hauler and forklift are studied, and hence the material moving efficiencies for both cases at different moving distances are obtained. The scheme is applied to the logistic plan of a production line in an automotive plant, and the results of calculation and verification show that a distance of 73 m is the demarcation of decision making for choosing hauler or forklift.
作者 王宁 徐雯霞
出处 《汽车工程》 EI CSCD 北大核心 2009年第8期782-787,共6页 Automotive Engineering
基金 上海市自然科学基金项目(07zr14120) 同济大学青年优秀人才培养行动计划项目(1700219043)资助
关键词 工业工程 汽车生产物流 作业时间 运送距离 industry engineering automotive production logistics operation time moving distance
  • 相关文献

参考文献13

  • 1Richard Senter JR, Michael S Flynn. Changing Interorganizational Patterns in The North American Automotive Supply Chain [ J ]. Applied Behavioral Science Review, 1999, 7 (1) :59 -81.
  • 2Ken Alternburg, Debbie Griscom, Hart, Frank Smith, Gary Wohler. Just-in-time Logistics Support for the Automobile Industry [J]. Production and Inventory Management Journal, 1999, 40 (2) :59 -66.
  • 3Axel Roder, Bernd Tibken. A Methodology for Modeling Intercompany Supply Chains and for Evaluating a Method of Integrated Product and Process Documentation [ J ]. European Journal of Operational Research, 2006 (169) :1010 - 1029.
  • 4Li Po - Chien , Lin Bou - Wen. Building Global Logistics Competence with Chinese OEM Suppliers [ J ]. Technology in Society, 2006(28 ) :333 - 348.
  • 5马士华,刘小群.基于客户订单的汽车物流整合方法[J].汽车工程,2007,29(2):174-178. 被引量:7
  • 6Robert Mason, Chandra Lalwani. Mass Customised Distribution [J]. Int. J. Production Economics, 2008 (114):71-83.
  • 7Jun Kaneko, Wataru Nojiri. The Logistics of Just-in-time Between Parts Suppliers and Car Assemblers in Japan[ J]. Journal of Transport Geography, 2008 (16) : 155 - 173.
  • 8Bonfill A, EspuNa A, Puigjaner L Decision Support Framework for Coordinated Production and Transport Scheduling in SCM [ J ]. Computers and Chemical Engineering, 2008 ( 32 ) : 1206 - 1224.
  • 9Boissiere J, Frein Y, Rapine C. Optimal Stationary Policies in a 3- stage Serial Production-distribution Logistic Chain Facing Constant and Continuous demand[ J]. European Journal of Operational Research, 2008 (186):608 - 619.
  • 10Mickey Howard, Joe Miemczyk, Andrew Graves. Automotive Supplier Parks: An Imperative for Build-to-order? [ J]. Journal of Purchasing & Supply Management, 2006 (12) :91 -104.

二级参考文献19

  • 1茆雯,仰书纲.上海通用汽车的一体化物流管理[J].工业工程与管理,2004(S1):138-142. 被引量:3
  • 2Elias S.New Vehicle Buyer Behaviour-quantifying Key Stages in the Consumer Buying Process[C].3DayCar Annual Year End Conference,Cardiff,2000.
  • 33 DayCar Research Team.Towards a Customer Driven System-A Summary of the 3DayCar Research Programme[EB/OL].Http://www.3daycar.com,2005.
  • 4Daugherty P J,Pittman P H.Utilization of Time-based Strategies:Creating Distribution Flexibility/Responsiveness[J].International Journal of Operations and Production Management,1995,15 (2).
  • 5Holweg M,Pil F K.Successful Build-to-order Strategics Start with the Customer[J].Sloan management Review,2001,43(1).
  • 6de Saint-Seine S.Renault Quits Build-to-order Quest[J].Automotive News Europe,2002 (7):4.
  • 7Christopher M,Towill D.An Integrated Model for the Design of Agile Supply Chains[J].International Journal of Logistics Management,2001,12(1):21 -35.
  • 8Holweg M,Joe M.Logistics in the" Three-day Car" Age-Assessing the Responsiveness of Vehicle Distribution Logistics in the UK[J].International Journal of Physical Distribution & Logistics Management,2002,32 (10):829-850.
  • 9Doran D.Synchronous Supply:An Automaotive Case Study[J].European Business Review,2001,13(2):114 -120.
  • 10Miemczyk J,Holweg M.Building Cars to Customer Order-What Does It Mean for Inbound Logistics Operations?[J].Journal of Business Logistics,2004,25(2):171-197.

共引文献6

同被引文献33

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部