摘要
简要介绍了邯矿集团陶一煤矿12701工作面沿空留巷的设计方案和实施过程,分析了高水材料巷旁充填沿空留巷与传统留巷方案相比具有的优点,指出了方案实施中存在的问题。
From the angles of coal seam occurrence, rock characters of roof and floor strata, geological tectonics, hydrology and the damages left over by small coal mines, this paper presents a brief introduction to the overall geological conditions of #12701 coal face in Taoyi mine, Handan Mining Group. Also described are the design scheme and its implementation of the gob-side entry retaining project in # 12701 face. A comparison made of the use of high water materials in roadside packing and traditional gob-side entry retaining practice results in advantages of the former over the latter. The paper also points out the remaining issues in the implementation of the design scheme.
出处
《中国煤炭》
北大核心
2009年第8期48-50,72,共4页
China Coal
关键词
沿空留巷
高水材料
巷旁充填
gob-side entry retaining, high water content material, roadside packing