摘要 采用三维有限单元法实际模拟锦屏一级拱坝左岸混凝土垫座施工浇筑过程,进行温度场和徐变温度应力场的仿真分析.通过计算值和实测值的对比以反演实际混凝土绝热温升,以此来校核并优化设计温控措施和温控标准.重点对在2009年3月开浇的1730 m高程以上的几个浇筑层进行了温控仿真计算,计算结果表明无论是温度还是应力都能满足设计标准,并为施工提供参考依据. Using three-dimensional finite element method, the construction process of the left bank concrete pedestal of Jinping I arch dam is simulated; and the simulation of the transient temperature field and the thermal stress field is also carried out. By comparing the calculated values and actual values we collected, we adjust the temperature rise property of thermal insulation to make it closer to the actual value, and the design of temperature control measures and temperature-controlled standard are checked and optimized. The temperature of several lifts which will be filled at the upcoming is simulated. The results show that both the tempera- ture and the thermal stress can meet the design standards; and all of these can offer theoretical references for the construction of Jinping I arch dam.
作者 段寅 周伟
出处 《三峡大学学报(自然科学版)》 CAS 2009年第4期9-13,共5页 Journal of China Three Gorges University:Natural Sciences
关键词 混凝土垫座 施工期 温度仿真 应力仿真 concrete pedestal construction period temperature simulation stress simulation
  • 相关文献

参考文献2

二级参考文献4

  • 1朱伯芳,水利水电技术,1986年,5期
  • 2朱伯芳,水利学报,1985年,4期
  • 3朱伯芳,水工混凝土结构的温度应力与温度控制,1976年
  • 4朱伯芳,水利学报,1957年,4期

共引文献176

同被引文献17

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部