摘要
实行工程量清单计价,施工企业要想在低标价与高成本的夹缝中生存,除了提高自身经营管理水平和技术水平外,做好综合单价、工程量、施工合同、工程变更和现场签证等方面的风险控制非常重要。
Using amount of project list to valuate, construction enterprise wants to live beltween the low marked price and expensive cost, besides improving one's own managerial skill and engineering level, the risk control in respects such as comprehensive unit price, amount of project, construction contract, project altering and on spot visa, etc. are very important.
出处
《煤炭技术》
CAS
北大核心
2009年第9期134-136,共3页
Coal Technology
关键词
工程量清单
计价模式
风险控制
list of the project amount
valuation mode
risk control