期刊文献+

天荒坪抽水蓄能电站地下厂房围岩支护设计 被引量:2

Design of surrounding rock support of underground power house of Tianhuangping Pumped storage Power Station
下载PDF
导出
摘要 天荒坪抽水蓄能电站地下厂房洞室群埋深200m,厂房纵轴线方位N30°W,主厂房与主变洞、尾水事故闸门洞依次平行排列,净间距分别为33.5m和78.4m。目前地下洞室群开挖支护完毕,通过实际施工期围岩原位监测,说明非线性平面有限元及三维弹塑性有限元分析成果对设计起了指导作用,结合非线性有限元分析,及时修正支护措施,确保了围岩稳定和结构安全。 The embedded depth of the chamber group for underground power house of Tianhuangping Pumped storage Power Station is 200 m The longitudinal axis of power house is in the direction of N30°W The main power house is parallel to main transformer chamber and emergency tailwater gate chamber with the net space distance of 33 5 m and 78 4 m respectively At present, the excavation and support of the underground chamber group have been completed The observation of the original surrounding rock during the construction period shows that the results from non linear plane finite element analysis and three dimensional elastic plastic finite element analysis have played a guide role in the design of the project In combination with the non linear finite element analysis to correct the support measures in time, the stability of surrounding rock and the safety of structures have been guaranteed
作者 杨小珑 孔勇
出处 《水力发电》 EI 北大核心 1998年第8期32-34,共3页 Water Power
关键词 地下厂房 围岩 支护 围岩稳定性 抽水蓄能电站 underground power house, surrounding rock analysis, finite element analysis, geological parameter, support parameter, monitoring, surrounding rock stability, Tianhuangping Pumped storage Power Station
  • 引文网络
  • 相关文献

同被引文献11

  • 1澂樑シリ-ズ16.岩鋆構造物の情報化設計施工[M].日本东京:社团法人日本地鋆工学会,2003.69~126
  • 2前島俊雄,森岡宏之,平井秀幸.神流川発電所空洞掘削における情報化施工[J].日本電力土木,2001,(291):16~20.
  • 3工藤圭吾,小山俊博,小松崎勇一.大规模地下空洞掘削への情報化設計施工技術の適用研究[J].日本土木学会論文集,1999,6,No.623/Ⅵ-43:69~83.
  • 4魏庭光,汪易森,邓昌铁.天荒坪抽水蓄能电站地下厂房洞室群围岩三维弹塑性有限元分析报告[R].北京,1996
  • 5白帆,贺钰钏,王晓辉.拉西瓦水电站地下厂房开挖分层及顶拱的开挖支护[J].水力发电,2007,33(11):77-79. 被引量:7
  • 6I-IOEK E, BROWN E T. Practical estimates of rock mass strength [J]. International Journal of Rock Mechanics and Mining Science,1998, 34(8) : 1165-1186.
  • 7HOEK E, CARRANZA-TORRES C, ure criterion-2002 Edition [ C ]// Proc CORKUM B. Hoek-Brown fail- NARMS-TAC Conference. To-ront~: University of Toronto Press, 2002 : 267-273.
  • 8肖明,苏鹏云,陈涛.瀑布沟地下厂房洞室群施工开挖数值模拟分析[C]∥第八次全国岩石力学与工程学术大会论文集成都:中国岩石力学与工程学会,2004:445-449.
  • 9朱骏发,张朝康,龙选民.二滩水电站地下厂房的开挖与支护[J].水力发电,1997(8):47-49. 被引量:3
  • 10温森,杨圣奇.基于Hoek-Brown准则的隧洞围岩变形研究[J].岩土力学,2011,32(1):63-69. 被引量:34

引证文献2

二级引证文献8

;