摘要
介绍了太钢炼铁厂一、二烧车间目前配料控制的现状,并就工艺流程再造后,对配料室控制系统的优化改造提出了具体实施方案。
The situation of hatching control system was introduced in the first and seconed sintering plant at Taigang. Based on technological process restructuring, the concrete effectuating plans were put forward on optimizing redevelopment of batching room control system.
出处
《山西冶金》
CAS
2009年第4期57-58,共2页
Shanxi Metallurgy