摘要
综采工艺在我国得到广泛的应用,但是综采机械安装难,需要时间长,与生产接续的矛盾日益突出。英安煤矿结合本矿实际,探索出符合煤矿地质条件的综采(精细化管理)快速安装技术。
The YingAn coal mine design is 900,000 presently checked productivity is 1, 800,000, we practice with the exploration, according to my ore mine shaft actual situation, explores conforms to my coal mine geological condition synthesis to pick (fine refinement management) to install the technology fast.
出处
《山东煤炭科技》
2009年第4期18-19,21,共3页
Shandong Coal Science and Technology
关键词
快速安装
液压支架
综采工作面
采煤机
rapid install machinery coal face fully- surface shearer