摘要
三峡工程将钢纤维硅粉混凝土应用于水工建筑主体工程施工在国内尚属首例。通过室内和现场施工试验,为三峡临时船闸坝段墩墙封堵叠梁门槽二期钢纤维硅粉混凝土提供了施工配合比和浇筑工艺。
It is the first in China that the steel -fibre -silico concrete is applied in the main works of the hydraulic structures. Through the laboratory test and field trial construction, the mix and placement procedures have been obtained for the second stage steel-fibre -silico concrete to be placed in the stoplog slots in the temporary shiplock columns at the Three Gorges Project.
出处
《中国三峡建设》
1998年第6期23-25,50,共3页
China Three Gorges Construction
关键词
钢纤维
硅粉
混凝土
浇筑
试验
Temporary shiplock columns Steel-fibre-silico concrete Tests Mix Placement procedures