摘要 通过对小浪底水库拦沙运用末期温孟滩河段河床下切较大情况下又遇大洪水的物理模型试验研究,初步认识到温孟滩河段河道整治工程基本能适应大洪水的作用,河势没有出现大的变化;从河底平均高程凋整分析得出,河床冲刷最大河段发生在遂村工程下首至化工工程河段;通过水位涨率和输沙分析,得出温孟滩河段河道整治工程没有明显的滞洪作用;从工程局部冲刷看,赵沟、裴峪工程局部冲刷最严重,经分析表明,冲坑深度不仅与流速有关,而且与工程的入流角关系密切。 It is primarily recognized that river control projects in Werunengtan reach are basically capable to deal with major floodswithout evident change of river configuration through the physical medel experimental study of major floods in Werunengtanreach under the condition of severe bed scouring in the last stage of sediment retention by Xiaolangdi reservoir. Analysis of theadjustment of river bed average elevation shows that the most severe scour is' located in the reach from Lucun to Huagongproject. There is no evident ability of flood retention for river contrnl projects in the reach though analysis of water level risingrate and sediment trasport. Viewing from the local scour, Zhaogou and peiyu projects are with the most severe local scour,and analysis demonstrates that scour depth is not only related to flow velocity but also closely to the angle of flow to the Popectbeing scoured.
出处 《人民黄河》 CAS 北大核心 1998年第8期1-3,20,共4页 Yellow River
关键词 整治工程 模型试验 温孟淮河段 水库 control project,experimental study,Wenmengtan reach,Xiaolangdi hydraulic key project
  • 相关文献

同被引文献4

  • 1吕文堂,马继业,窦焕春.黄河下游堤防加固措施及适应性分析[J].中国水利,2004(15):48-49. 被引量:7
  • 2河南黄河勘测设计研究院.温孟滩移民安置区河道工程设计工作报告[R].郑州:河南黄河勘测设计研究院,2003.
  • 3河南黄河勘测设计研究院.温孟滩移民安置区放淤改土工程设计工作报告[R].郑州:河南黄河勘测设计研究院,2003.
  • 4王修果 果继稳 张太存 等.截渗墙与放淤固堤技术在堤防加固中的比较.中国水利,2003,(10):49-50.

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部