摘要
介绍了宽尾墩联合消能工在百色水利枢纽的研究和应用:(1)采用宽尾墩—中孔—消力池联合消能工的试验研究和水力计算;(2)采用宽尾墩—阶梯式坝面(坝面消能)—消力池联合消能工的试验研究。
The investigation and application on techniques of flaring gate piers (FGP) incorporated dissipator for Baise project is presented that include in two part:(1) model test and analysis of FGP-middle oulets (skip jump)-stilling basin (hydraulic jump) incorporated dissipator,(2) model study of FGP-stepping spillway surface (spillway surface dissipator)-stilling basin (hydraulic jump) incorporated dissipator.
出处
《红水河》
1998年第2期36-41,47,共7页
Hongshui River
关键词
宽尾墩
联合消能工
底流消能
挑流消能
水利枢纽
flaring gate piers,incorporated dissipator,stilling basin dissipation,skip-jump dissipation,surface dissipation