期刊文献+

锦屏一级水电站安全生产的施工组织措施 被引量:4

Discussion about Safe Production Construction Organization Measures at Jinping 1^(st) Stage Hydraulic Power Station
原文传递
导出
摘要 锦屏一级水电站工程施工的重点和难点主要在坝肩开挖、拱肩槽边坡基础处理、混凝土垫座等部位的施工,它们的安全生产是整个工程顺利完成的保障。为此对坝肩高边坡稳定、大坝基础开挖及支护、施工期水流控制、各项交叉施工的协调及现场安全管理等方面系统地制定了工程安全生产的施工组织措施。 Key and difficult points for construction at Jinping 1 st Stage Hydraulic Power Station include mainly dam shoulder excavation, side slope foundation treatment of arch shoulder chute, concrete pedestal, etc. whose safe production will be a guarantee of whole project. So construction organization measures of safe production are worked out systemically for dam shoulder upper-side slope stability, dam foundation excavation and supporting, water flow control during construction, coordination of cross constructions and site safety management.
出处 《电力建设》 2009年第9期88-90,共3页 Electric Power Construction
基金 国家工程项目(发改能源[2005]1696号)
关键词 水电站 安全生产 施工组织措施 hydraulic power station safe operation construction organization measures
  • 相关文献

参考文献8

二级参考文献16

共引文献108

同被引文献10

引证文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部