摘要
介绍了在采空区充填时采用木结构密闭墙、负压脱水和渗滤管过滤材料清理系统等技术,加快了脱水速度,减小了充填材料对密闭墙的压力,为确保连续充填创造了条件。
This paper introduces the techniques of sealed stopping in wood structure,dewatering by negative presure and cleaning system of filtering with percolation pipe,accelerating dewatering of filling material;minifying the pressure of filling material to sealed stopping and creating the condition of filling contiuously.
出处
《黄金》
CAS
北大核心
1998年第8期17-21,共5页
Gold
关键词
空区密闭
负压脱水
渗滤管
金矿
采矿
sealing of minedout area
dewatering by negative pressure
percolation pipe