摘要 为实现矿井安全生产,针对永华嵩山煤矿冲积层地质条件复杂、含水层相互连通的情况,在其地质及水文地质资料基础上,分析浆液在冲积层的运动规律及作用方式。采取调整浆液性质和浓度、控制注浆压力、改变注浆方式等措施,取得了良好治水效果,丰富了立井井筒冲积层注浆堵水研究体系。 The geology condition of alluvial layer is complex in Yonghua Coal Mine, and the aquifers communicate with each other. In order to realize safe production of coal mine, aimming at these conditions, based on the data of geology and hydrology geology, motion regulation and function method Of slurry in alluvial layer was analyzed. By adopting these methods such as adjusting the property and density of slurry,controlling the pressure of slurry,changing the grouting method etc,good effects of water control have been obtained. All this enriched the research system of blocking water by grouting in alluvial layer.
作者 雒发生
出处 《中州煤炭》 2009年第9期96-97,136,共3页 Zhongzhou Coal
关键词 滑动构造 浆液性质 浆液护壁 封堵加固 slide structure slurry property use slurry to protect wall side reinforce with sealing and blocking
  • 相关文献

同被引文献14

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部