大跨度箱梁整孔运架一体吊架系统设计 被引量:1

Design of Hoisting Frame System for Transportation and Erection of Full Long Span Box Girders
下载PDF
导出
摘要 结合上海长江隧桥B4标段105 m钢-混凝土叠合箱梁施工实际,介绍大跨度箱梁整孔运架一体吊架系统的主要构造、系统功能和工作原理,在沿海施工条件恶劣地区,该方法有较好的实用性。 In the light of the construction of the 105-m span steel and concrete composite box girders of Contract B4, Shanghai Changjiang River Tunnel and Bridge Construction Project, this paper presents the principal structural formation, functions and working principles of the hoisting frame system designed for both the transportation and erection of the full long span box girders. The system has very good practical application to large engineering structures in the costal areas where the construction conditions are hash.
作者 任继新
出处 《世界桥梁》 北大核心 2009年第3期73-75,共3页 World Bridges
关键词 叠合箱梁 运输 架设 桥梁机械 设计 composite box girder transportation erection bridge machinery design
  • 相关文献

参考文献4

  • 1陈理平,黄勇.105m钢-混凝土组合箱梁长距离运输架设技术[J].桥梁建设,2008,38(4):74-77. 被引量:2
  • 2中国船级社.船舶与海上设施起重设备规范[M].北京:人民交通出版社,2007.
  • 3成大先.机械设计手册[M].北京:化学工业出版社,2002..
  • 4中国船级社.材料与焊接规范[M].北京:人民交通出版社.2006.42.

二级参考文献2

共引文献931

同被引文献8

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部