摘要
文章结合东营黄河大桥桥头高填土跨越黄河大坝的工程实例,介绍采用喷浆法进行大坝高填土加固的设计方法及施工工艺,并对其加固效果进行了评述。
Combined with the construction project in Dongying Huanghe Bridge,the article introduces the design methods and construction techniques for strengthening the high hill of Huanghe Dam,and also give some comments on its strengthen per-formance.