期刊文献+

阳江核电厂土石方一期工程设计经验总结

Experience conclusion of first stage construction of cubic metre of earth and stone project in Yangjiang nuclear electrical power plant
下载PDF
导出
摘要 以广东阳江核电厂区土石方工程为例,针对现场反馈设计中存在的主要问题,对其主要原因进行了分析和探讨,并作了经验总结,指出在土石方工程设计初期,应加强勘探工作,合理确定土石比,结合现场实际确定石料。 Taking cubic metre of earth and stone project in nuclear electrical power plant of Yangiiang in Guangdong as example, the paper analyzes and discusses about the main reasons of problems in feedback in site, it also makes conclusion according to experiences, it points out that in the primary stage of cubic metre of earth and stone project, we should strengthen the exploration work, make sure the soil and stone pattern, and assure the stone combining with the site.
作者 雷达
出处 《山西建筑》 2009年第28期85-86,共2页 Shanxi Architecture
关键词 核电厂 土石方工程 土石比 问题 经验 nuclear electrical power plant, cubic metre of earth and stone project, soil and stone pattern, problem, experiences
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部