摘要
针对新建H铁路沿线基床表层填料十分匮乏的问题,对H铁路路基表层填筑A组土和级配碎石比选进行了技术经济分析比较,并针对全线不同地段选择了不同的填料方案,从而节省了工程投资。
Aiming at the scarcity of the surface filler along new-built H railway, the paper has the comparison analysis of the technological analysis between filled A-group soil and the graded broken stone on H railway, and selects various filling schemes for different sections along the railway, so as to save the project investment.
出处
《山西建筑》
2009年第28期274-275,共2页
Shanxi Architecture
关键词
路基填料
A组土
级配碎石
roadbed filler, A-group soil, graded broken stone