摘要
结合广州快速路现状、规划设计以及长隆动物园段改线要求,提出了改线线路方案,对线路平面、纵断面方案进行了比选和研究,初步确定了推荐方案为主要方案,解决了改线段线路方案设计的问题。
Combining present situation of Guangzhou highway, requirements of planning design and changing route design of Xinguang mad of Changlong zoo, the paper proposes scheme for changing route, it compares and studies route surface and cross surface of route, and determines the introducing scheme is the main scheme, and thus resolve the scheme design problem of changing route.
出处
《山西建筑》
2009年第28期283-284,共2页
Shanxi Architecture
关键词
快速路
改线方案
比选
road, changing route scheme, compares