摘要
就设备无垫板安装工艺——顶丝调整法以及坐浆法作了介绍,详细阐述了坐浆法施工中坐浆坑凿出、坐浆材料选取及配比、坐浆盒制作、垫板标高确定及坐浆垫块养护等工艺,以完善设备安装标高控制技术。
The equipment installation process without backing plate,i.e.jackscrew top thread method,and the bed pulp method were introduced,the bed pit chisel,bed pulp material choice and mix ratio,bed pulp box production,backing plate level determination and bed pulp backing plate maintenance in the bed pulp method were detail illustrated,so as to complete equipment installation level control technology.
出处
《山西建筑》
2009年第26期131-133,共3页
Shanxi Architecture
关键词
设备安装
标高控制
顶丝调整法
坐浆法
垫块
equipment installation
level control
jackscrew top thread method
bed pulp method
backing plate