摘要
针对建设工程竣工结算的重要性,分析了工程预算多报现象的产生原因,提出了正确确定工程变更计价的方法,总结了建设工程竣工结算失真的原因,以更好地解决工程结算中的问题和矛盾。
Aiming at the importance of the settlement auditing in architectural engineering,the paper analyzes the reasons for why the budget is more than the actual one,points out correct methods to change the cost valuation,and sums up reasons for the settlement distortion,so as to solve the problems and contradiction in project settlement in a better way.
出处
《山西建筑》
2009年第26期245-246,共2页
Shanxi Architecture
关键词
工程
竣工结算
审核
工程变更
project
completion settlement
auditing
project change