期刊文献+

基于人因工程的生产线平衡的研究 被引量:6

Line Balanced Research Based on Human Factors
下载PDF
导出
摘要 生产系统主要由人、机、物、法、环五要素组成。人为因素是影响生产线平衡的重要因素之一,利用人的可靠性分析方法对可能造成人误的任务进行预测,提前做出预防工作,减少生产事故的发生;运用人因工程学的知识对生产环节的不合理之处提出改善,为工人营造一个舒适、科学、合理的工作环境。通过以上两方面对生产线进行优化,对不合理之处进行改进,消除瓶颈工位,使运行流畅,从而提高生产线平衡率。 Production system including five key elements which are man,machine,material,method and environment.The human factors are one of the most important key elements.Using the people's reliability analysis method to carry out a forecast on the mission may bring about the human errors,doing the preventive job,cutting down the accident occurrence.And using the human factors engineering's method to make the improvement about the unreasonable,building a comfortable,science,reasonable work environment for the workers.Making an optimization about the line balancing through the two aspects,improving the unreasonable,removing the bottleneck labor place,making the production line fluently,improving the production line balance rates thereby.
作者 叶晓素 蔡勇
出处 《机电工程技术》 2009年第9期42-43,158,共3页 Mechanical & Electrical Engineering Technology
关键词 生产线平衡 人的可靠性分析 人因工程 line balancing human reliability analysis human factors engineering
  • 相关文献

参考文献3

二级参考文献29

  • 1戴立操,张力,黄曙东.复杂工业系统中人因失误根本原因分析[J].中国安全科学学报,2003,13(11):13-16. 被引量:15
  • 2戴立操,张力,黄曙东.核电厂HRA定性评价及应用[J].工业工程与管理,2005,10(1):17-20. 被引量:2
  • 3Hendrick H W. Ergonomics:An International Perspective[M] CRC Press, 1999.
  • 4Manufacturing Studies Board. Toward a New Era in U. S. Manu facturing:The Need for National Vision[ M ]. Washington D. C.:National Academy Press, 1986.
  • 5Bi S,Salvendy G. Analytical modeling and experimental study of human workload in scheduling of advanced manufacturing sys tems[J ]. The Int J of Human Factors in Manufacturing, 1994,4 (2) :205 - 234.
  • 6Majchrzak A, Paris M L.L.High - perforrmng organizations match technology and management strategies:Result of a survey [ J ]. Int of Industrial Ergonomics, 1995,16(4 - 6) :309 - 326.
  • 7Salvendy G. Hand Book of Human Factors and Ergonomics[M].John Wiley & Sons, Inc., 1997:1 865- 1 925.
  • 8Duffy V,Danek A, Salvendy G. A predictive model for the successful integration of concurrent engineering with people and or ganizational factors:Based on data of 25 companies[J]. The Int J of Human Factors in Manufacturing, 1995,5(4) :429 - 445.
  • 9史蒂文@L@戈德曼,罗杰@N@内格尔,肯尼思@普瑞斯(美).灵捷竞争者与虚拟组织[M].杨开峰等译.沈阳:辽宁教育出版社,1998.
  • 10Kidd P . Agile Manufacturing: Forgin New Frontiers [M].Reading, MA: Addison Wesley, 1994.

共引文献30

同被引文献40

引证文献6

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部