摘要 为实现兼顾经济性和可靠性的HVDC输电系统的规划设计,讨论了计及经济性和可靠性的HVDC输电系统最优备用方案模型及其应用。在给出HVDC备用设备等年值投资费用、等年值运行费用、停电损失费用等的计算方法后基于综合最小费用提出了HVDC输电系统最优备用分析模型。鉴于实际HVDC输电工程中,设备的备用数量有限,提出了设备最优备用模型求解的枚举解析法。用一单12脉接线HVDC输电系统为例分别对交流滤波器、换流变压器、晶阐管、平波电抗器等备用模式进行决策对比分析并基于成本-效益原则确定了HVDC备用优选方案。算例表明该模型和方法能够应用到实际HVDC输电系统实现设备的最优备用规划和设计。 We discussed the optimal spare analysis for high-voltage-direct current (HVDC) transmission system con- sidering economy and reliability. Considering the capital, maintenance and the costumer interruption costs, we proposed an optimal model for spare components in HVDC based on the minimum cost. An enumeration-analytical method was proposed to solve this model based on the fact that there are usually only a few spare components in practical HVDC projects. A single 12-pulse winding HVDC transmission system was used for case studies. The spare analysis of AC filter, transformer, thyristor and smooth reactor were studied using cost-benefit method. The results show that the proposed model and calculation procedure can be applied to practical HVDC transmission sys- tems in planning and design processes.
出处 《高电压技术》 EI CAS CSCD 北大核心 2009年第9期2286-2291,共6页 High Voltage Engineering
基金 国家"十一五"科技支撑计划重大项目(2006BAA02A21) 国家自然科学基金(50777067) 教育部新世纪优秀人才支持计划(NCET-05-0762) 重庆市自然科学基金重点项目(CSTS2008BC7031)~~
关键词 HVDC 输电系统 经济性 可靠性 最优备用分析 成本-效益分析原则 HVDC transmission systems economy reliability optimal spare analysis cost-benefit principle
  • 相关文献

参考文献17

  • 1张雪松,王超,常勇,高鹏.GO法在特高压直流输电可靠性研究中的应用[J].高电压技术,2009,35(2):236-241. 被引量:13
  • 2周静,马为民,石岩,韩伟.葛南同杆并架直流工程可靠性研究[J].高电压技术,2007,33(1):152-155. 被引量:7
  • 3LI W. Risk assessment of power systems: models, methods and applieations[M]. Piscataway, New Jersey, USA: Wiley-IEEE Press, 2005.
  • 4李文沅,周家启,颜伟,谢开贵.基于可靠性的电力系统设备备用规划方法[J].中国电机工程学报,2006,26(15):7-11. 被引量:20
  • 5Li W, Vaahedi E, Mansour Y. Determining number and timing of substation spare transformers using a probabilistic cost analysis approach[J]. IEEE Transactions on Power Delivery, 1999, 14(3) : 934-939.
  • 6Wangdee W, Li W, Shun W, et al. Applying probabilistic method in determining the number of spare transformers and their timing requirement[C]//Proceedings of the 2007 Canadian Conference on Electrical and Computer Engineering. Vancouver, British Columbia, Canada: [s. n. ], 2007: 137-140.
  • 7Chowdhury A A, Koval D O. Development of probabilistie models for computing optimal distribution substation spare transformers[J]. IEEE Transactions on Industry Applications, 2005, 41(6): 1493-1498.
  • 8Kuruganty S. Effect of HVDC component enhancement on the overall reliability performance[J]. IEEE Transactions on Power Delivery, 1994, 9(1): 343-351.
  • 9Hamoud G. Reliability assessment tools for utilities in the deregulated electricity market [C]// Proceedings of the 2007 IEEE Power Engineering Society General Meeting. Tampa, Florida, USA: IEEE, 2007.. 1-7.
  • 10丁明,齐先军,安玲.旋转备用市场中考虑可靠性的多目标分层决策[J].电力系统自动化,2007,31(13):17-22. 被引量:16

二级参考文献94

共引文献114

同被引文献73

引证文献5

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部