摘要
以苏丹喀土穆炼厂扩建工程焦碳塔基础施工为例,主要从材料选用、改善大体积混凝土基础约束条件、浇灌组织设计、保温和水置换养护、温度跟踪控制等五大环节对大体积混凝土施工进行质量控制,取得了良好的施工效果。
With the coke tower foundation construction of Sudan Khartoum refinery extension engineering as example,the mass concrete construction quality was controlled from material choice,improving mass concrete foundation confined condition,irrigating organization design,heat insulation and water replacement supporting,temperature follow-up control,the better construction effect was obtained.
出处
《山西建筑》
2009年第27期159-160,共2页
Shanxi Architecture
关键词
裂缝
应力
基础约束
温度控制
crack
stress
foundation confine
temperature control