摘要 针对实施可中断负荷管理过程中存在的问题,研究了考虑用户价格反应后的实时电价的特点,通过建立交易双方基于自身利益最优的响应方程,为系统下一时段可中断负荷合同、电价折扣及可中断负荷电价的确定提供了依据. Aiming at solving the problems in implementing interruptible load management, the characteristics of spot-time price is analyzed considering customer's price responsiveness. And the sensitivity equation of utility and customers is founded based on their own optimal profit, which can decide the principle of interruptible load contract, price discount and the interruptible load price for next period of the power system .
出处 《中原工学院学报》 CAS 2009年第4期54-57,共4页 Journal of Zhongyuan University of Technology
关键词 可中断负荷管理 价格反应 实时电价 interruptible load management price responsiveness spot-time price
  • 相关文献

参考文献5

  • 1王建学,王锡凡,王秀丽.电力市场可中断负荷合同模型研究[J].中国电机工程学报,2005,25(9):11-16. 被引量:115
  • 2Chen C S, Leu J T. Interruptible Load Control for Taiwan Power Company[-J]. IEEE Transactions on Power Systems, 1990,5 (2) :460-465.
  • 3黄福全,任震,黄雯莹,吴杰康,潘锡芒.电力市场中考虑用户价格反应的实时电价[J].中国电力,2002,35(10):45-49. 被引量:13
  • 4KANKAR Bhattacharya, MATH H J Bollen,JAAPE Daalder. Real Time Optimal Interruptible Tariff Mechanism Incorporating Utility-customer Interactions[J].IEEE Trans on Power System, 2000, 15(2) :700-706.
  • 5Majumdar S, Chattopadhyay D, Parikh J. Interruptible Load Management Using Optimal Power Flow Analysis[J].IEEE Trans On Power Systems,1996,11(2): 715-720.

二级参考文献13

  • 1宋依群,倪以信,侯志俭,吴复立.基于均衡分析的总统调合同电量比例研究[J].中国电机工程学报,2004,24(7):64-67. 被引量:16
  • 2王良友,赵永亮,杨素萍,周健,黄群.电能期货合同市场的输电拥堵定价及其输电网的开放[J].中国电机工程学报,2004,24(8):12-16. 被引量:6
  • 3Malik A S. Simulation of DSM resources as generating units in probabilistic production costing framework [J]. IEEE Trans. on Power System, 1998, 13(4): 460-465.
  • 4Tuan L A, Bhattacharya K. Interruptble load management within secondary reserve ancillary service market [C]. IEEE Porto Power Tech Conference. Porto, Portugal. Sep. 10-13, 2001: 1-6.
  • 5Huang Kun-Yuan, Chin Hong-Chan, Huang Yann-Chang. A model reference adaptive control strategy for Interruptible load management [J]. IEEE Trans. on Power System, 2004, 19(1): 683-689.
  • 6Strbac G, Farmer E D, Cory B J. Framework for the incorporation of demand-side in a competitive electricity market [J]. IEE Proceedings on Generation, Transmission and Distribution, 1996, 143(3): 232-237.
  • 7Doudna J H. Overview of California ISO summer 2000 demand response programs[C]. IEEE Proceedings of Power Engineering Society Winter Meeting. Ohio, USA. January 28- February 1, 2001:228-233.
  • 8Billinton R, Allan R N. Reliability evaluation of power systems [M].Plemum Press, 1996.
  • 9戴彦,倪以信,文福拴,韩祯祥.电力市场下的无功电价研究[J].电力系统自动化,2000,24(5):9-14. 被引量:61
  • 10谭伦农,张保会.市场环境下的负荷备用容量[J].电力自动化设备,2003,23(6):10-12. 被引量:17

共引文献126

同被引文献7

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部