摘要
活性污泥法的主要构筑物,有初次沉淀池、曝气池、二次沉淀池、污泥回流设施和供氧设施等。它们在生产运转过程中是一个相互联系、相互影响的整体。实践证明:只有通过分析各部功能和相互影响,使之相互协调和平衡,才能发挥由一系列构筑物组成的整体系统作用。其中,又以BOD-污泥负荷为活性污泥法的中心问题。
The activated sludge process′s main buildings include the grit chamber,the aeration tank,the secondary sedimentation tank,the return sludge facility and the oxygenprovided equipment. They compose an interconnected and mutualinfluence unit during the process.lt is proved that we can cooperate in balance with each part by way of analysing every part′s function and its mutualinfluence, which can bring the function of the unit into play.And BODsludge loading is the key factor of the activated sludge process.
出处
《合肥工业大学学报(自然科学版)》
CAS
CSCD
1998年第3期55-62,共8页
Journal of Hefei University of Technology:Natural Science
关键词
设计因素
微生物
活性污泥法
废水处理
BODsludge loading,some factors relating to the design,microbe