活性污泥处理装置与有关设计因素的关系

THE RELALIONSHIP AMONG SOMEFACTORS RELATING TO THE DESIGNOF THE ACTIVATED SLUDGE PROCESS
下载PDF
导出
摘要 活性污泥法的主要构筑物,有初次沉淀池、曝气池、二次沉淀池、污泥回流设施和供氧设施等。它们在生产运转过程中是一个相互联系、相互影响的整体。实践证明:只有通过分析各部功能和相互影响,使之相互协调和平衡,才能发挥由一系列构筑物组成的整体系统作用。其中,又以BOD-污泥负荷为活性污泥法的中心问题。 The activated sludge process′s main buildings include the grit chamber,the aeration tank,the secondary sedimentation tank,the return sludge facility and the oxygenprovided equipment. They compose an interconnected and mutualinfluence unit during the process.lt is proved that we can cooperate in balance with each part by way of analysing every part′s function and its mutualinfluence, which can bring the function of the unit into play.And BODsludge loading is the key factor of the activated sludge process.
作者 郑传宁
出处 《合肥工业大学学报(自然科学版)》 CAS CSCD 1998年第3期55-62,共8页 Journal of Hefei University of Technology:Natural Science
关键词 设计因素 微生物 活性污泥法 废水处理 BODsludge loading,some factors relating to the design,microbe
  • 相关文献

参考文献3

  • 1高延耀.水污染控制工程[M].北京:高等教育出版社,1989..
  • 2顾夏声.水处理工程[M].北京:清华大学出版社,1990..
  • 3Cooper P F,Alkinson B, Biological fluidisde bed treatment of water AND wastewater water research centre, 1981.

共引文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部