摘要
在中硬煤层中实施放顶煤开采时,对煤层打钻进行高压注水,软化煤质后回采率明显提高。文章对煤层高压注水前后的回采率对比,以及对如何打钻和注水时间的确定进行了阐述。
When the fully mechanized caving mining is put into practice in the medium hard coal seam,the high-pressure water injection is carried out,the coal nature is softened,the recovery rate is significantly raised.In the paper,the contrast of recovery rate around high-pressure water injection in coal seam,how to drill,and the determination of water injection time are expounded.
出处
《煤炭技术》
CAS
北大核心
2009年第6期68-70,共3页
Coal Technology
关键词
综采放顶煤
打钻
高压注水
软化煤层
回采率
fully mechanized caving mining
drilling
high-pressure water injection
softening coal seam
recovery rate