摘要 杏花煤矿133综采队,正式回采西二三区30#左部条带采面时,上下巷为不平行的工作面,回采期间需进行增加支架和调刀工作。为了减少调刀和加架子影响正常的回采,提高生产效率,杏花矿成功的对此进行了合理的回采。通过对综采面调刀、加架子回采的总结分析,为以后综采工作面调刀、加架子提供了一点经验。 In the last stage of mining deep - seated 30# left work - face, the runnel length is different, the slope adjustment mining is applied by the NO. 133 fully mechanized coal mining team of Xinghua coal mine in order to enhance the production errieiency. Adjusted in order to reduce the impact of knife rack and processing of the recovery to normal, increase productivity, i have mine the success of a reasonable recovery, Through the transfer of fully mechanized mining face knives, plus a summary of the shelf recovery analysis, for the subsequent transfer of fully mechanized mining face knives, plus a shelf to provide a bit of experience.
出处 《煤炭技术》 CAS 北大核心 2009年第10期44-45,共2页 Coal Technology
关键词 加架子 虚调刀中心 回采 increase the shelf slope adjustment center mining
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部