刘庄煤矿1302工作面中巷采用大功率综掘机等新型设备,使掘进面机械化程度得到提高,减少了人员劳动强度,提高了工效,掘进进尺突破千米,取得了很好的经济效益。
The new equipments, such as the high - power fully mechanized excavation machines etc., were used in the middle roadway at No. 1302 coal face in Huzhuang Coal Mine. The level of mechanization at driving coal face was improved. The labor intensity of personnel was reduced. The ergonomics was improved. The boring footage breaked through 1 km. The good efficiency was obtained.
出处
《煤炭技术》
CAS
北大核心
2009年第10期55-56,共2页
Coal Technology
关键词
煤巷
综掘
快速掘进
coal roadway
fully mechanized driving
fast excavation