摘要
在车工生产实习教学管理中引入PDCA循环,周密计划,严格执行,认真检查,妥善处理,可以促进学生技能操作水平的不断提高,促进教学管理部门教学管理水平不断提升,有效地提高车工实习的教学质量。
The introduction of PDCA cycle in the teaching management of turning production practice, which requires well--conceived plan, strict implementation, careful inspection and appropriate handling, can enhance the students operational level, the management level of the teaching management section, and the teaching quality of turning practice effectively.
出处
《江汉石油职工大学学报》
2009年第5期28-29,共2页
Journal of Jianghan Petroleum University of Staff and Workers