摘要
结合广州南沙开发区中船造船基地配套道路工程(以下简称"中船基地配套道路")的软基处理实践,对软基优化处理的一些问题进行探讨。
This article unifies in the Guangzhou Nansha development zone the ship shipbuilding base nee-essary road engineering (hereafter refers to as “ship base necessary path”) the soft base processing practice,optimizes processing to the soft base some questions to carry on the discussion.
出处
《低温建筑技术》
2009年第9期116-117,共2页
Low Temperature Architecture Technology
关键词
软基处理
沉降
垫层
路堤填筑
soft base processing
subsidence
breaker strip
embankment reclamation