摘要
讨论全站仪配合PC-E500袖珍计算机使用统一坐标系统进行高等级公路施工测量,重点分析高等级公路施工阶段,控制点、细部点的坐标计算方法和测设方法.
The paper summarizes that construction survey for high-grade highway is performed with the combination of PC-E500 and total station in unification coordinate system, and introduces coordinate calculation, layout method of control point and detail point at the stage of construction survey for high-grade highway.
出处
《福州大学学报(自然科学版)》
CAS
CSCD
1998年第5期65-68,共4页
Journal of Fuzhou University(Natural Science Edition)
关键词
全站仪
施工控制点
高等级公路
施工测量
total station
construction control point
side pile layout
center pile layout
highway