摘要
对山西省沁水县郑庄乡张峰村沁河干流上的张峰水库供水发电洞进口布置提出了两种设计方案,比较了两方案的主要工程特性,分析了技施设计、施工过程中出现的问题,提出了解决这些问题的办法。
This article proposes two design plans for the entrance of the power tunnel of Zhangfeng reservoir on the main stream of Qin River of Zhangfeng Village of Zhengzhuang Town of Qinshui County of Jincheng City,Shanxi province,and compares their project peculiarities,analyses their construction technology and the problems that may arise in construction,and proposes the solutions to the problems.
出处
《科技情报开发与经济》
2009年第25期168-170,共3页
Sci-Tech Information Development & Economy
关键词
供水
发电洞
方案比选
张峰水库
water supply
power tunnel
scheme comparison
Zhangfeng Rreservoir