期刊文献+

GQ89型贯通式潜孔锤活塞仿真分析及优化设计 被引量:1

Numerical Simulation and Optimum Design of Piston in GQ89 DTH Hammer
下载PDF
导出
摘要 活塞是贯通式潜孔锤内部的一个重要运动部件,也是产生冲击力、实现冲击碎岩的关键零部件,其受力情况复杂。先对试验生产中破坏的活塞进行有限元分析,找到破坏原因,再通过应力、应变分析优化设计出新活塞。 Piston is a moving part of DTH hammer, which produces impact force to realize impacting breaking rock with complicated stress. Firstly, finite element analysis on the old piston that had been broken in the experiment was made with the ANSYS/LS - DYNA program to find out the cause leading to piston' s destruction; then new piston was optimum designed based on the analysis on stress and strain with finite element software.
出处 《探矿工程(岩土钻掘工程)》 2009年第9期36-39,共4页 Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词 活塞 受力分析 有限元 优化设计 piston stress analysis finite element optimum design
  • 相关文献

参考文献6

二级参考文献17

共引文献24

同被引文献38

  • 1殷琨,蒋荣庆.潜孔锤反循环钻进技术及应用[J].探矿工程,1996(5):13-15. 被引量:17
  • 2王文龙,王禹,李永哲,殷琨,高科.贯通式潜孔锤反循环连续取心(样)钻进工艺在新疆某矿区复杂地层中的应用试验[J].探矿工程(岩土钻掘工程),2006,33(2):54-56. 被引量:8
  • 3长春黄金设计院.乌努格吐山铜钼矿资源开发可行性研究报告[R].长春:长春黄金设计院,2006.12.
  • 4FredrikGabrielsson.采用新潜孔锤概念的反循环钻进[J].采矿与建筑,2008(1):26-27.
  • 5潘殿琦,蒋荣庆,殷琨.贯通式潜孔锤气力喷反钻具系统[J].探矿工程,1997(4):32-33. 被引量:3
  • 6Atlas C opco Group. 2010. Atlas Copco Equipment guide [ S ]. 26 -27 (in Chinese with English abstract).
  • 7Atlas Copco Group. 2008. RC L8 hydraulic open-air DTH rig safety,oper-ation and maintenance [ S ]. 14 - 28 ( in Chinese with English ab- stract).
  • 8Changchun Gold Design Institute. 2006. WuNuGeTu copper-molybdenum ore resource development feasibility study report [ R ]. Geological Resources : 1 - 19 ( in Chinese).
  • 9Chen Jia-wang, Yin Kun, Peng Jian-ming. 2004. Through type DTH hammer reverse circulation flow field analysis and structure optimiza- tion of drill bit [ J ]. Exploration Engineering ( Rock &Soil Drilling And Tunneling) , 31 (4) :35 -37( in Chinese).
  • 10Deng Meng-chun, Lu Sheng-lin, Yin Kun, Huang Cheng-hui. 2013. Appli- cation reseach on demonstration of air reverse circulation drilling for prospecting in geological exploration [ J ]. Exploration Engineering ( Rock & Soil Drilling And Tunneling) ,40 ( 3 ) : 1 - 6 ( in Chinese with English abstract).

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部