期刊文献+

铁路系统基于风险的定量安全评估方法 被引量:36

Quantitative Safety Assessment Method Based on Risk in Railway System
下载PDF
导出
摘要 研究基于风险的定量安全评估方法,对我国铁路系统进行定量安全评估。基于风险的定量安全评估过程分为危害事件识别、定量风险分析及评估、风险处理和风险持续监测及管理4个步骤。采用故障树技术分析导致危害事件发生的成因及其频率,采用事件树技术分析危害事件发生后可能导致的后果,从而确定危害事件的风险水平。利用此方法对铁路平交道口进行定量安全评估结果表明:列车与机动车在平交道口相撞是平交道口风险最高的危害事件;该危害事件在该类型全部道口可能导致的平均等效死亡人数约52个.年-1;降低该事件发生频率最有效的措施是对司机进行安全教育,对防护栏进行定期检查和维护;减轻该事件后果严重性最有效的措施是严格控制客车超载。 A method of quantitative safety assessment based on risk in railway system is introduced in this paper,which comprises four steps,including hazard event identification,quantitative risk analysis and assessment,risk control,continuing monitoring and management.Fault tree analysis is used to find the cause and frequency of hazard event,and event tree analysis is used to develop the outcome,then the level of the risk of hazard event is got.Some conclusions from the application of the method into level crossing can be drawn: the collision between a train and a car is the hazard event with the highest risk, which can bring 52 equivalent fatalities in a year. Education to driver and periodic inspection and maintenance of protective guard can reduce the frequency of this hazard event effectively, and the prevention of overloading can minish its severity of outcome.
出处 《中国铁道科学》 EI CAS CSCD 北大核心 2009年第5期123-128,共6页 China Railway Science
基金 铁道部科技研究开发计划项目(2006YF19)
关键词 铁路系统 风险 定量安全评估 故障树分析 事件树分析 平交道口 Railway system Risk Quantitative safety assessment Fault tree analysis Event tree analysis Level crossing
  • 相关文献

参考文献11

  • 1Joint Technical Committee (JTC).AS4360:2004 Australia / New Zealand Standard on Risk Management[S].Australia:JTC,2004.
  • 2Rail Safety and Standards Board (RSSB).The Railway Strategic Safety Plan 2006[Z].UK:RSSB,2006.
  • 3The Institute of Risk Management (IRM).Risk Management Standard:ALARM The National Forum for Risk Management in the Public Sector[Z].UK:The Institute of Risk Management (IRM),2002.
  • 4张曙光.高速铁路系统生命周期安全评估体系的研究[J].铁道学报,2007,29(2):20-26. 被引量:27
  • 5Office of Rail Regulation (ORR).Railway Safety Principles and Guidance[Z].UK:ORR,2006.
  • 6Rail Safety and Standards Board (RSSB).Profile of Safety Risk on the UK Mainline Railway[R].UK:RSSB,Issue 3,2003.
  • 7LIU Jinghui,ZHANG Hongyu.Risk-Control Model Approach of Level Crossing in China[C] //D3-Report on Risk Modeling Techniques for Level Crossing Risk and System Safety Evaluation.UK.RSSB,2008.
  • 8贾明涛.铁路道口事故分析与预测研究[D].北京:北京交通大学,2006.
  • 9Rail Safety and Standards Board (RSSB).Level Crossing Safety Performance Report 2006:Report[Z].UK:RSSB,20O6.
  • 10自立芬.机电产品故障树的计算机辅助建树与分析[D].北京:清华大学,1994.

二级参考文献14

  • 1李发荣.预先危险分析在安全评价中的应用研究[J].安全与健康,2004(08S):42-44. 被引量:7
  • 2潘艳荣,翟长旭,朱顺应.基于灰色聚类理论和人工神经网络技术的道路交通安全评价[J].重庆交通学院学报,2005,24(2):101-104. 被引量:27
  • 3宋彤,周妍.基于系统分析的控制系统故障树自动生成[J].系统工程理论方法应用,2005,14(6):514-518. 被引量:9
  • 4《运筹学》教材编写组.运筹学[M].北京:清华大学出版社,1996..
  • 5一木幹生.鉄道車両のRAMSについて.JREA,2007,50(1):50-53.
  • 6铁路合作组织委员会 杨晓蓓译.欧盟统一铁路机车车辆制造和运营技术标准.铁路合作组织通讯,2006,(2):15-22.
  • 7廖煥平.設計/建造合一制專案交付方式之品保/品管實務分析探討-以台灣高鐵C260標爲例[D].台中:朝陽科技大學,2004:36-37.
  • 8Network Rail.Yellow Book-Engineering Safety Management Issue 3[Z],London:Railtrack PLC,2000:9-12.
  • 9CENELEC.EN50126 Railway applications-Specification and demonstration of reliability,availability,maintainability and safety (RAMS)[S].London:British Standards Institution,1999:30-69.
  • 10Hassan Y,Gibreel G.Evaluations of Highway Consistency and Safety:Practical Application[J].Journal of Transportation Engineering,2000,23(3):255-260.

共引文献26

同被引文献238

引证文献36

二级引证文献240

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部