BOT项目风险多属性群决策识别方法 被引量:7

Multiple Attribute Group Decision Method of Risk Identification of BOT Project
下载PDF
导出
摘要 本文提出的BOT项目风险识别方法可以客观计算专家的权重和风险属性的权重,反映不同专家、不同属性对决策结果的影响。通过把BOT项目风险决策矩阵转化成多维向量,用两向量的夹角余弦计算专家的相似度和差异度;利用熵值推导得到属性的权重,如果某个属性对决策所起的作用越大,则其熵值就越小、权重越大,并根据综合决策值排序得到风险识别结果。最后,本文通过一个典型的BOT项目验证了该识别方法的可行性和有效性。 A new risk identification model for BOT project is established to calculate the weights of experts and attributes more objectively,and to reflect the impacts of different decision-makers and different attributes more reasonably. Firstly, angle cosine of two-space vector transformed from multi-dimensional vector is derived into the similarity and the difference of experts. Secondly, the weights of attributes reflecting the importance degree for decision-making are derived from entropy expressing information content of attributes. While the entropy of a attribute is smaller,the weight is bigger. Risk identification result is based on the value of integrated decision-making. A typical case proves that the method is feasible and reasonable.
出处 《技术经济》 2009年第9期50-52,62,共4页 Journal of Technology Economics
基金 国家自然科学基金项目(70572097) 住房和城乡建设部软科学研究项目(2009-R3-09)
关键词 BOT项目 风险识别 多属性 群决策 BOT project risk identification multiple attribute group decision
  • 相关文献

参考文献15

  • 1ROBERT L K T. Risks and guarantees in BOT tender[J]. Journal of Construction Engineering and Management, 1995,121 (2) :183-188.
  • 2SALMAN A F M, SKIBNIEWSKI M J, BASHA I. BOT viability model for large-scale infrastructure projects[J]. Journal of Construction Engineering and Management, 2007,133(1) : 50-63.
  • 3XENIDIS Y,ANGELIDES D. The legal risks in build-operate-transfer projects [ J]. Journal of Construction Research, 2005,6 (2) : 273-292.
  • 4XENIDIS Y, ANGELIDES D. The financial risks in buildoperate-transfer projects [ J ]. Construction Management and Economics,2005,23(4) :431-441.
  • 5ZAYED T M, CHANG L M. Prototype model for build- operate-transfer risk assessment[J]. Journal of Management in Engineering, 2002,18(1) : 7-16.
  • 6DAVID A K. Risk modeling in energy contracts between host utilities and BOT plant investors[J]. IEEE Transaction Energy Conversion, 1996,11 (1 2) : 359-366.
  • 7YANG W H,DAI D S. Concession decision model of BOT projects based on a real options approach[C]. Proc. 13th Conf. Management Science and Engineering,ICMSEr06, Lille, France, 2007 : 307-312.
  • 8ChlARA N, GARVIN M J, VECER J. Valuing simple multiple-exercise real options in infrastructure project[J]. Journal of Infrastructure Systems, 2007,13(2) : 97-104.
  • 9HUANG Y L,CHOU S P. Valuation of the minimum revenue guarantee and the option to abandon in BOT infra- structure projects[J]. Construction Management and Economics, 2006,24(4) :379-389.
  • 10CHARLES Y J C, LIU J. Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation[J]. Construction Management and Economics,2006,24(5):545-554.

二级参考文献9

共引文献39

同被引文献63

引证文献7

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部