期刊文献+

清水砼厂房施工及创新

Construction and Innovation of Bare Concrete Main Power House Frame
下载PDF
导出
摘要 华电新乡宝山电厂一期工程主厂房框架及大型设备基础采用清水砼结构。模板采用清水砼专用覆膜胶合板,梁、柱棱角采用圆弧形倒角工艺,柱面模板接缝处采用分隔条明缝处理,采用槽钢加固,取消柱内对拉螺栓,大型设备基础采用PVC板衬模工艺。砼严格按规定配制、浇捣,拆模后适当清修,保证了清水砼构件尺寸准确,表面平整、色泽一致。 The bare concrete structure is applied in main power house frame and large-scale equipment foundation of 1st project of Baoshan power plant from Huadian Corporation, Xinxiang. Formwork is teetorial plywood-elagsification applied by bare concrete. Beam and column arris adopt circular arc bevel craftwork. Location of cylinder formwork joint adopts break apparent seam treatment and reinforced by channel. Split bolt inside column shall be cancelled, PVC plate lined form craftwork shall be applied in large-scale equipment foundation. Concrete will be confected, poured and vibrated strictly as per requirements. The same shall be properly cleaned and repaired after dismantling the formwork to ensure component size of bare concrete accurate, surface even and tidy and color and luster consistent.
作者 孟克
机构地区 山东电建一公司
出处 《山东电力技术》 2009年第5期75-77,共3页 Shandong Electric Power
关键词 清水砼 倒角条 明缝 施工工艺 bare concrete bevel apparent seam craftwork
  • 相关文献

参考文献5

  • 1建筑施工手册第四版编写组.建筑施工手册(第四版)[M].北京:中国建筑工业出版社,2004,11.
  • 2彭圣洁.建筑工程质量通病防治手册[M].北京:中国建筑工业出版社,2002.769-771.
  • 3中国建筑科学研究院主编.GB50204-2002混凝土结构工程施工及验收规范[S].北京:中国标准出版社,2002,4.
  • 4中华人民共和国国家发展和改革委员会编.DL/T5210.1-2005电力建设施工质量验收及评定规程[S].北京:中国电力出版社.2005.6.
  • 5中国建筑工程总公司编.清水混凝土施工工艺标准[S].北京:中国建筑工业出版社,2005,3.