摘要
介绍了时标网络计划在聊城(北)编组站施工中的应用。对施工进度三级时标网络计划体系的建立、运行实施中的各个环节进行了较为详尽的说明;并在工期、质量、成本同步控制方面进行了有益探讨;对实施结果进行了分析评价;最后,提出实践中的体会及对今后类似大型工程项目进度管理的建议。
This paper introduces the application of the Time - marking Network Plan (TNP) to the construction of Liaocheng North Railway Mashalling Statin,including the illustration about the establishment and implementation of the construction progress threegrade TNP in detail and the evaluation about the implementing result. In addition,some relevant problomas on the control of the time limit,the quality and the cost for project are discussed. Finally,the paper puts forward the understanding about this practice and some proposals about the construction progress management of similar large projects afterwards.
出处
《石家庄铁道学院学报》
1998年第3期16-21,共6页
Journal of Shijiazhuang Railway Institute
关键词
编组站
时标网络计划
工期控制
施工
Liaocheng North Railway Mashalling Statin the Time-marking Network Plan time limit control