期刊文献+

在役斜拉桥索力测试研究 被引量:2

Study of Cable Force Test of Cable-stayed Bridge under Service
下载PDF
导出
摘要 该文以某在役斜拉桥为对象,通过对该斜拉索索力测试结果和理论计算结果的对比分析,推定该桥多年运营后斜拉索中留存的索力情况,判定是否要对该桥的斜拉索进行索力调整,以确保桥梁运营安全。 Taking a cable-stayed bridge under service as an example, and according to the contrast and analysis of the test result and theoretical calculation result of the stayed cable force, the article deduces the cable force conditions existing in the stayed cable of this bridge after many years of operation, and determines whether or not to adjust the cable force of the cable- stayed bridge so as to ensure the operation safety of this bridge.
出处 《城市道桥与防洪》 2009年第9期78-80,93,共4页 Urban Roads Bridges & Flood Control
关键词 斜拉桥 索力测试 索力调整 运营安全 cable-stayed bridge, test of cable force, adjusting of cable force, operation safety
  • 相关文献

参考文献3

  • 1CJJ 99-2003,城市桥梁养护技术规范[S].
  • 2JTGF80/1-2004.公路工程质量检验评定标准[S].[S].,..
  • 3唐堂,张永水.斜拉桥索力测试分析[J].昆明理工大学学报(理工版),2008,33(2):38-42. 被引量:7

二级参考文献3

共引文献591

同被引文献12

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部