预应力混凝土连续梁桥主桥合龙施工技术 被引量:3

Closuring Construction Technology of Main Bridge for Prestressed Concrete Continuous Girder Bridge
下载PDF
导出
摘要 该文结合工程实例,以主跨100m预应力混凝土连续梁桥为背景,分析了温度梯度作用下温度变化对中跨合龙施工的影响,以及利用挂篮进行中跨合龙的原理。通过分析和计算,得出了对连续梁桥合龙段施工有一定参考价值的结论。 Combined with the engineering practice, taking the main span 100-m prestressed concrete continuous girder bridge as the background, the article analyzes the influence of temperature variation on the midspan closuring construction under the action of temperature grades, and the principle to implement the midspan closure by form traveler. Through the analysis and calculation, the article gives the referring value of conclusion for the construction of closuring section of the continuous girder bridge.
出处 《城市道桥与防洪》 2009年第9期109-111,共3页 Urban Roads Bridges & Flood Control
关键词 施工控制 中跨合龙 温度 挂篮 空间有限元 construction control, midspan closure, temperature, form traveler, span finite element
  • 相关文献

参考文献4

二级参考文献2

  • 1.JTJ023-85.钢筋混凝土桥涵设计规范[S].,1985..
  • 2范立础.预应力混凝土连续梁桥[M].北京:人民交通出版社,2001..

共引文献21

同被引文献16

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部