天津站轨道换乘中心逆作法桩柱定位安装技术 被引量:1

Location and Installation Technology of Pile and Column Constructed with Reverse Method in Transfer Center of Tianjin Station
下载PDF
导出
摘要 逆作法在大型公共建筑中应用日渐广泛,但其施工工艺、机械设备、技术水平等方面都存在一定的局限性。天津站轨道换乘中心工程为3层纯地下结构,其盖挖逆作法柱长近30m,桩长48-56m。在桩、柱之间无底板或承台过渡情况下,进行单桩单柱连接,这种情况国家规范尚无明确规定。通过实践,提出深位桩桩顶定位标准及桩孔空钻部分垂直度控制标准,详细制定了钢管柱整体吊装定位方法、定位标准及施工技术要点,很好地解决了深孔位下桩、柱连接的技术和质量问题。 Reverse method flourishes extensively in large-scale public buildings, however there are some limitations in construction technology, equipments and technical level. Transfer Center of Tianjin Station is built with the reverse method. The project is an underground structure with three stories, whose column length is close to 30m and pile length varies from 48m to 56m. Single column is connected with each pile without transition of slab or beating platform, and there is no regulation in standards. Through practice, standards for deep pile top location and pile holes verticality control are suggested. Moreover, detailed location method, standard and key construction points are decided to solve the problems in connection of deep pile and column suecessfully.
作者 张志新
出处 《施工技术》 CAS 北大核心 2009年第9期54-56,共3页 Construction Technology
关键词 天津站换乘中心 逆作法 桩柱定位 允许偏差 Transfer Center of Tianjin Station reverse method pile and column location allowable deviation
  • 相关文献

参考文献5

  • 1上海市基础工程公司.GB50202-2002建筑地基基础工程施工质量验收规范[S].北京:中国建筑工业出版社,2002.
  • 2中国建筑科学研究院.JGJ94-2008建筑桩基技术规范[S].北京:中国建筑工业出版社,2008.
  • 3哈尔滨建筑工程学院,中国建筑科学研究院.CECS28:90钢管混凝土结构设计与施工规程[S].北京:中国计划出版社,2001.
  • 4韩林海,杨有福.现代钢管混凝土结构[M].北京:中国建筑工业出版社,2004.
  • 5中国建筑科学研究院,清华大学.CECS203:2006自密实混凝土应用技术规程[S].北京:中国计划出版社,2006.

共引文献204

同被引文献5

引证文献1

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部