期刊文献+

应用错层位巷道布置提高综放初采回收率的研究 被引量:2

Research on layout of dislocated strata gateway applied to improve initial mining recovery rate of fully mechanized top coal caving mining
下载PDF
导出
摘要 根据错层位巷道布置采煤法初采期间的顶板状态,分析影响初采期间顶煤回收率的主要因素,并与实际工程应用中的实测数据进行对比,总结出应用错层位巷道布置采煤法提高初采期间顶煤回收率的机理。 According to the roof status in the initial mining period of the coal mining with the gateway layout in the dislocated strata,the paper analyzed the main factors affected to the top coal recovery rate in the initial mining period.In comparison with the site measured data applied in the actual project,the paper summarized the mechanism for the application of the mining method with the gateway layout in the dislocated strata to improve the top coal recovery rate in the initial mining period.
出处 《煤炭工程》 北大核心 2009年第9期94-96,共3页 Coal Engineering
关键词 错层位 综放开采 煤岩稳定性 回收率 dislocated strata fully mechanized top coal caving mining stability of coal and rock recovery rate
  • 相关文献

参考文献2

  • 1吴健,赵景礼,盂宪锐.全国第三届放顶开采理论与实践研讨会论文集[C].1998.
  • 2赵景礼.厚煤层错层位巷道布置采全厚采煤法[P].中国专利ZL98100544.6,2002(1)

共引文献9

同被引文献12

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部