摘要
首先结合工程所处的地质环境,分析了高边坡可能出现的破坏情况,然后结合工程特点,提出相应的加固方案,最后综合考虑施工方法和经济条件选择便于实施的加固方案和措施,以确保高边坡稳定、安全。
By combining with the geological environment of the project,the paper analyzes the possible damage situations for the high side slope,points out relative intensification scheme according to the project characteristics,and sums up the consideration of the construction methods and economic conditions which are good for the implementation of the intensification scheme and measures,so as to ensure the stability and security of the high side slope.
出处
《山西建筑》
2009年第29期102-103,共2页
Shanxi Architecture
关键词
高边坡
加固方法
措施
high side slope
intensification method
measures