期刊文献+

基于α-截集的企业知识管理能力模糊评价 被引量:3

Fuzzy Evaluation of Knowledge Management Capability of Enterprise Based on α-Cut
下载PDF
导出
摘要 在定义企业的知识管理能力后,给出了知识管理能力的评价指标。它们包括知识流程管理能力和知识管理基础能力。基于模糊理论建立了模糊成对比较矩阵。然后应用α-截集和几何平均方法进行了模糊权分析。基于模糊权分析,提出了企业的知识管理能力的模糊评价方法。该方法通过实例进行了验证。 After defining the knowledge management capability of enterprise,it presents the capability indices that are composed of knowledge management process capability and infrastructure capability.With fuzzy theory,a fuzzy pairwise comparison matrix is built.Then,by using α-cut and geometric mean,fuzzy weight analysis can be done.Based on the fuzzy weight analysis,a fuzzy evaluation technique of knowledge management capability of enterprise is proposed.It is verified by a practical example.
作者 王娟茹 杨瑾
出处 《工业工程》 北大核心 2009年第4期91-95,共5页 Industrial Engineering Journal
基金 陕西省社会科学基金资助项目(08E016) 西北工业大学科技创新基金资助项目(2008KJ02036)
关键词 知识管理能力 α-截集 评价模型 knowledge management capability α-cut evaluation model
  • 相关文献

参考文献13

  • 1Gabriel Cepeda, Dusya Vera. Dynamic capabilities and operational capabilities:a knowledge management perspective[ J 1. Journal of Business Research,2007,60 (5) :426-437.
  • 2Kevin Desouza, Roberto Evaristo. Global Knowledge Management Strategies [ J ]. European Management Journal, 2003,21 ( 1 ) :62-67.
  • 3Roy Lubit. The keys to sustainable competitive advantage: tacit knowledge and knowledge management [ J]. Organizational Dynamics ,2001,29 (3) : 164-178.
  • 4Liu Pang-lo, Chen Wen-chin, Tsai Chih-hung. An empirical study on the correlation between knowledge management capability and competitiveness in Taiwan' s industries [ J ]. Technovation,2004 (24) : 971-977.
  • 5Mike Bresnen, Linda Edelman, Sue Newell, et al. Social practices and the management of knowledge in project environments [ J ]. International Journal of Project Management, 2003,21 ( 3 ) : 157-166.
  • 6Fan Zbi-ping, Feng Bo, Sun Yong-hong, et al. Evaluating knowledge management capability of organizations: a fuzzy linguistic method [ J ]. Expert Systems with Applications, 2008,34(2) :812-820.
  • 7吴旭燕,李俊涛.基于AHP的企业知识管理能力模糊综合评价[J].科技管理研究,2005,25(11):43-45. 被引量:10
  • 8郑庆华,刘存后.企业知识管理能力的模糊语言评估[J].统计与决策,2007,23(13):142-143. 被引量:5
  • 9Chuang Shu-Hui. A resource-based perspective on knowledge management capability and competitive advantage:an empirical investigation [ J ]. Expert Systems with Applications, 2004 (27) :459-465.
  • 10郭彦文,徐盈之.现代服务业知识管理能力综合评价模型研究[J].广东经济管理学院学报,2006,21(5):27-31. 被引量:10

二级参考文献18

  • 1徐国祥,常宁.现代服务业统计标准的设计[J].统计研究,2004,21(12):10-12. 被引量:84
  • 2刘常勇.知识管理与企业发展[EB/OL].http://www.chinakm.com/,2003—12—9/2004—12—19.
  • 3Bassi H. Amassing the power of intellectual capital[J]. Training &:Development, 1997, 51 (12): 25 ~ 30.
  • 4Hansen M, Nohria lq, Tierney T. What's your strategy for managing knowledge? [J]. Harvard Business Review, 1999,(3- 4): 106 ~116.
  • 5Aim J H. Valuation of knowledge: A business performance-oriented methodology [ C ]. Proceedings of the 35th Hawaii International Conference on Systems Science, USA, 2002.
  • 6Fairchild A M. Knowledge management metrics via a balanced scorecard methodology [ C ]. Proceedings of the 35th Hawaii International Conference on Systems Science, USA, 2002.
  • 7Tiwana A. The essential guide to knowledge management: E-business and CRM applications[ M ]. Atlanta: Prentice-Hall, 2001.
  • 8Hitt M A, Ireland R D, Lee H Y. Technological learning, knowledge management, finn growth and performance: an introductory essay[ J ].Journal of Engineering and Technology Management, 2000, ( 17 ):231 ~ 246.
  • 9Liang G S, WangM J. Personnel selection using fuzzy MCDM algorithm[J]. European Journal of Operational Research, 1994, 78:22 ~ 33.
  • 10Liang G S. Theory and methodology: fuzzy MCDM based on ideal and anti-ideal concepts [ J ], European Journal of Operational Research,1999, 112: 682~691.

共引文献112

同被引文献40

  • 1吴旭燕,李俊涛.基于AHP的企业知识管理能力模糊综合评价[J].科技管理研究,2005,25(11):43-45. 被引量:10
  • 2刘婕,余冬梅.多目标决策中权重的一种综合集成确定法[J].甘肃科技,2007,23(7):66-68. 被引量:5
  • 3DANIEL J, FLINT. Compressing new product success - to - success cycle time Deep customer value understanding and idea generation [J]. Industrial Marketing Management, 2002, 31 (4) : 305 -315.
  • 4LOUISY Y LU, CHAN YANG . The R&D and marketing cooperation across new product development stages: An empirical study of Tai- wan' s IT industry [ J]. Industrial Marketing Management, 2004, 33 (7): 593-605.
  • 5PINGKIT L , KWAISANG C. Identifying and prioritizing critical sue- cess factors for conflict management in collaborative new product de- velopment [ J ]. Industrial Marketing Management, 2005, 34 ( 8 ) : 761 - 772.
  • 6JANICE E C, FRANZA R. Investing in product development and pro- duction capabilities : The crucial linkage between time - to - market and ramp- up time [ J]. European Journal of Operational Research, 2006, 171 (2) : 536 -556.
  • 7PMI Standards Committee. A guide to the project management body of knowledge [ M]. Bruxellcs: Project Management institute, 2000.
  • 8Cleland D. Project stakeholder management [ J]. Project Manage- ment, 1986, 17 (4): 36-44.
  • 9FAN ZHIPING , FENG BO, SUN YONGHONG, et al. Evaluating knowledge management capability of organizations: a fuzzy linguistic method [ J]. Expert Systems with Applications, 2008, 34 (2) : 812 - 820.
  • 10HAI ZHUGE. A knowledge grid model and platform for global knowledge sharing [ J]. Expert Applications, 2002 (22) : 313 - 320.

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部